Polyurethane coating machine Lxpu30s - GTB
A, raw material
Components mix material temperature viscosity
A1 100 20 to 60 ℃ < 100 CPS
A2 100 20 to 60 ℃
15-100 - B 20 to 60 ℃
S1 S2 S3 0.2 3 room temperature < 1000 CPS
Second, the container
A1, A2, B material tank capacity of 250 c, 20 c paste volume
Three, metering pump,
A1, A2, metering pump adopt joint venture brands (kawasaki) JR50, adding filler used GPA25
Metering pump adopts JR20 B
Four, the technical parameters
(1) flow: 2-8 kg/min (33-133 - g/s) 5 ‰ or less precision
(2) leather production line running speed 4-40 / min
(3) coating thickness 0.08 to 0.9 min
(4) the nose running speed 0-5000 - mm/min
(5) the nose mobile always travel 1700 mm, cleaning a 200 mm
Lifting height 300 6 organ
All landowners with cold and hot electromechanical integrated temperature control, all the pipe is equipped with heating system
Today the new head can realize long-term gating function, not temperature is not material.
Pet-name ruby authority run
Copyright ? 2013 - Zhejiang lingxin polyuretane co., LTD 浙ICP備14042619號-1
Address:Ruian international automobile industrial park road rossi Tel:400 826 8887